About Upper Gassaway Bridge
A wrought iron truss first crossed the Elk River at Gassaway, West Virginia, in 1913, and when it was replaced in 1935 the new bridge was set on the same cut stone piers. Built by the Works Progress Administration and the State Roads Commission with steel from Cicero, Illinois, it carried a riveted Parker through truss between Warren pony trusses at either end.
It was patched and plated through the second half of the century, but by 2016 the narrow lanes, weight limits, and section loss in its truss members had made it obsolete, and rehabilitation would have left it weight-restricted anyway. Orders Construction built a replacement curving downstream for $4.7 million, keeping the old approaches in use. The new bridge opened in late 2023, and on January 9, 2024, explosive charges dropped the 1935 span into the river.
History
The Upper Gassaway Bridge carried WV 4 over the Elk River at Gassaway, West Virginia. The first structure at the crossing was erected in 1912 and 1913, a wrought iron truss set upon cut stone piers and abutments. 2 3 5
A replacement followed in 1935, built by the Works Progress Administration and the State Roads Commission with steel from the Midland Structural Steel Company of Cicero, Illinois, and carried on the piers of the original. 1 4 The new bridge comprised a riveted Parker through truss as its main span, a polygonal Warren pony truss at either end, and a concrete slab span. 3
A new roadway deck was laid in 1963, and the back wall repaired in 1970. 4 Further work followed in 1990 on the back wall, the lower chords, the sway bracing, and the floor beams, with repairs to the stringers in 1992 and to the pier cap in 1995. The lower chords were plated in 1996.
Replacement
By 2016 the bridge was judged both functionally and structurally obsolete. 2 3 It had no shoulders, its travel lanes were narrow, and it imposed restrictions on height and on the weight of heavy vehicles. Significant section loss in the primary and secondary truss members had left it structurally unsound. It carried some 1,900 vehicles a day. 6
A project to replace or rehabilitate the crossing was begun in 2018, considering five alternatives. 3 Rehabilitating the 1935 structure was found impracticable. The work would not raise the original H-15 load capacity, so the bridge would remain weight-restricted and retain its fracture-critical members, and it would require a temporary bridge throughout the project at greater cost than any other course. The decision was taken instead to build a new girder bridge fifteen feet downstream of the existing one.
In November 2020, Orders Construction was awarded a contract of $4,719,806 to build the new crossing and remove the old. 6 The replacement curves downstream of the truss bridge, an alignment chosen so that the original approaches could be kept in use. Construction began in mid-2022.
Demolition
The new bridge opened to traffic in late 2023, and the 1935 span was taken down on January 9, 2024. 6 Explosive charges set at key points cut through the steel trusses, and the bridge fell into the river.
The state bridge engineer, Tracy Brown, said the new structure would carry heavier vehicles through the town and serve the area for the next seventy-five to a hundred years. 6
Structure
Dimensions & Classification
| Structural Form | Pony Truss — Parker Pony Truss — Warren Girder — Concrete slab |
|---|---|
| Primary Material | Steel |
| Total Length | 339' |
| Main Span | 157'5" |
| Number of Spans | 4 |
| Span Lengths | 79'2"×2, 157'5", 15' |
| Deck Width | 25' |
| Roadway Width | 24' |
| Vertical Clearance | 14'5" |
| Vertical Navigational Clearance | 43' |
| Engineer / Designer | State Roads Commission Works Progress Administration |
| Builders | Midland Structural Steel Co. (superstructure) |
Photographs








Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Sources & Citations
References for this location, in MLA format.
Show all 6 sources
- “Bridge plaque.”
- “Informational Workshop Public Meeting.” West Virginia Department of Transportation, 6 Sept. 2018. ↗
- “Appendix A: Bridge Replacement Study.” West Virginia Department of Transportation, ↗
- “Upper Gassaway Bridge.” West Virginia Historic Property Inventory Form, 2 Jul. 2002. ↗
- “History/Architecture Report for the Upper Gassaway Bridge Project.” Civil & Environmental Consultants, 31 Jul. 2017. ↗
- “Demolition of Upper Gassaway Bridge completes $4.7 million bridge replacement project.” West Virginia Department of Transportation, Jan. 2024. ↗
Comments