About Jay Covered Bridge
A flood carried off the bridge that preceded it. On the night of September 30, 1856, a storm broke over the Adirondacks, a dam gave way, and ten bridges over the East Branch of the Au Sable went downstream. George M. Burt contracted to build a replacement in April 1857, and the 175-foot Howe truss he raised at Jay, New York, cost $1,200 and was covered the following year. It survived a town truck through its floor in 1953, an ice jam in 1976, and a runaway tractor trailer in 1985, before state inspectors closed it in 1997. Cut into four pieces and set on the riverbank, it lay there a decade while the town argued over its fate. It was rebuilt and returned to its crossing in 2007, the longest covered bridge in New York and the last one standing in the Adirondacks.
History
The Jay Covered Bridge carries a single span across the East Branch of the Au Sable River at Jay, New York. Built in 1857 by George M. Burt, it is the longest covered bridge in the state, the only one remaining in the Adirondacks, and the last standing in Essex County. 1 2 It is listed on the New York State Register of Historic Places.
The Great Freshet
Rain began on September 30, 1856, and in the night a violent thunderstorm turned it into a torrent. 1 David Heald, who kept a cabin at Rainbow Falls and had been working on the dam, afterward described the cataract he saw pouring down Mount Colvin. The dam gave way, and in Keene Valley the water rose nearly three feet in a quarter of an hour.
Ten bridges over the East Branch were carried downstream, the two at Keeseville alone excepted. 1 Among them were those within the township of Jay, including the crossing that preceded the present structure.
Construction
The contract for a new bridge was awarded on April 26, 1857, to George M. Burt of Au Sable Forks. 1 5 Burt built it that year, though it was not covered until 1858.
The single span runs 175 feet and employs the Howe truss, patented in 1840 by William Howe of Springfield, Massachusetts, and improved by him in 1850. It incorporates iron tie rods and bearing blocks in the form of an inverted T, the blocks thought to have been patented by Reuben Comins of Troy in February 1857. 5 The original cost of construction was $1,200. 1
Damage and Repair
A heavy town truck broke through the floor and beams in January 1953. 1 3 The repairs required replacing eighty feet of the damaged end, and the bridge was shortened and underpinned with a concrete abutment and new piers.
An ice jam in 1976 came close to carrying the bridge off its abutments altogether. On November 7, 1985, a tractor trailer lost its brakes on the approach and tore out wooden beams and steel supports as it came through. The driver held the rig straight the length of the bridge, which spared both his life and the structure anything worse.
Closure
Following an inspection by the New York State Department of Transportation, the Jay Covered Bridge was closed to traffic on May 14, 1997, and traffic rerouted along back roads. 1 5 What followed was contentious. Proposals to demolish the bridge or replace it with a modern span found no agreement, and on June 12 the structure was cut into four sections, lifted individually from its abutments, and set down along the east bank of the Au Sable. 1 2 There it remained for ten years. A temporary bridge was installed on the old foundation in 1998.
A grant of $1 million toward restoring the bridge won the support of a House appropriations committee in March 1998. 2 The money was to come under the Intermodal Surface Transportation Efficiency Act, subject to passage by the full House and approval by a joint House-Senate conference committee.
In 1999, the state Department of Transportation issued a draft design report and environmental impact statement examining alternatives for County Route 22 and a new crossing of the East Branch. 4 It recommended realigning the roadway downstream of the covered bridge, a course that met the project’s objectives with the least disturbance to the community and the environment and no major impacts identified. The work would require 1.6 miles of new roadway and a bridge 375 feet long. Both the county and the Adirondack Park Agency supported it.
Rehabilitation
The question was settled in 2006, and the bridge was rehabilitated and returned to its crossing in 2007. 1 Not all of the original truss members could be reused, and the result is formally considered a new bridge rather than the old one restored.
A rededication was held on October 14, together with the dedication of the adjacent Douglas Memorial Park. 1 The bridge has since hosted weddings and community gatherings.
Structure
Dimensions & Classification
| Structural Form | Through Truss — Howe |
|---|---|
| Primary Material | Timber |
| Total Length | 175' |
| Deck Width | 15'7" |
| Roadway Width | 13'8" |
| Vertical Clearance | 8' |
| Builders | George M. Burt |
Photographs





Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Sources & Citations
References for this location, in MLA format.
- Hewston, Sharron. “Jay.” ↗
- Thompson, Maury. “Federal funding for Jay covered bridge clears hurdle.” The Post-Star, 27 Mar. 1998, p. B11.
- “Truck Crashes Planking in Jay Covered Bridge.” The Post-Star, 30 Jan. 1953, p. 20.
- Final Environmental Impact Statement. New York State Department of Transportation, Feb. 2002.
- Berfield, Rick L. “Preface.” Covered Bridges of New York State, Syracuse University Press, 2003, pp. xv-xvi, 13-14.
Comments