About Brown Road Bridge
Constructed in 1915 by the Bellefontaine Bridge and Steel Company, the riveted Pratt through truss replaced an earlier span that was washed out in a 1913 flood. 1
In early 2010, the county engineering office studied options for rehabilitation or replacement of the Brown Road Bridge because of its poor structural condition. 1 It was decided to construct a new bridge at the cost of $2.3 million, with work beginning in mid-2011. The federal-local bridge program funded up to 95% of the estimated $1.5 million in construction and engineering costs, with the remainder coming from Delaware County road and bridge funds.
Structure
Dimensions & Classification
| Structural Form | Through Truss — Pratt |
|---|---|
| Total Length | 125 feet |
| Main Span | 117 feet |
| Deck Width | 16 feet |
| Vertical Clearance | 11.5 feet |
Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Sources & Citations
References for this location, in MLA format.
- “Brown Road Bridge over Bokes Creek.” Delaware County Ohio, 3 Feb. 2010. ↗ Accessed 4 Apr. 2012.
Comments