This is an aerial view of the active and abandoned Tunnel No. 8 pairs at Ford. After CTC was implemented, the route was mostly single tracked and the northbound bore (at left) was kept active while the southbound bore (at right) was abandoned.
A Comprehensive Record of Engineering Landmarks