Silver Memorial Bridge

Ohio, West Virginia

Total Length 2,800 feet
Status Active

Silver Memorial Bridge carries US Route 35 over the Ohio River between Henderson, West Virginia, and Gallipolis, Ohio.

Construction of the Silver Memorial Bridge began in 1968 downstream of the former Silver Bridge which had collapsed and was opened to traffic on December 15, 1969. 1 2

Dimensions & Classification

Structural FormThrough Truss — Warren
Total Length2,800 feet

1 comment

  1. Connor Cogswell

    Did American Bridge Corp build the Memorial Bridge?

Leave a Reply

Spotted an error — a date, name, or fact? Send a correction and I'll review it.

References for this location, in MLA format.

  1. FHWA By Day. Federal Highway Administration, “FHWA By Day.” Federal Highway Administration,
  2. LeRose, Chris. “The Collapse of the Silver Bridge.” West Virginia Historical Society, Oct. 2001.