About Taftsville Covered Bridge
Constructed in 1836 by Salmond Emmons III, the crossing was rehabilitated in 1869, 1910, and 1952. A laminated wooden arch was added in the early 20th century to provide greater load-carrying capacity. In 2011, the southern span was severely damaged by flooding and was reconstructed in 2013.
Structure
Dimensions & Classification
| Structural Form | Through Truss — Kingpost |
|---|---|
| Primary Material | Timber |
| Total Length | 189 feet |
| Main Span | 93 feet |
| Deck Width | 14.8 feet |
| Vertical Clearance | 8 feet |
Photographs

Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Comments