16 Tech Bridge

Indiana

Built 2026
Total Length 342'
Status Active

The 16 Tech Bridge, a suspension bridge under construction over Fall Creek, connects West 10th Street with the 16 Tech Innovation District in Indianapolis.

The 16 Tech Bridge is a suspension bridge over Fall Creek, connecting West 10th Street and Riley Hospital Drive with the 16 Tech Innovation District in Indianapolis, Indiana.

In December 2021, the 16 Tech Community Corporation unveiled the bridge’s design, developed by a team led by schlaich bergermann partner (sbp) and Practice for Architecture and Urbanism (PAU). [1] The multidisciplinary team also included Moniteurs Communication Design, Martha Schwartz Partners (MSP), Shrewsberry & Associates, CTL Engineering, Circle Design Group, and People for Urban Progress (PUP).

Community engagement played a crucial role in shaping the design. The team conducted outreach through mailers, online surveys, virtual meetings, hotlines, site walks, neighborhood canvassing, and a partnership with a local STEM-based school. [1][5] An advisory committee of residents and civic leaders guided this process. In response, the design prioritized pedestrians and cyclists by creating accessible public spaces and separating them from vehicular traffic.

The bridge features a distinctive suspension design with a fan-like arrangement of smaller masts rather than a single vertical mast. [1][5] Flat steel plates serve as the main supports, replacing traditional suspension cables while accommodating the unique mast configuration. [1] This innovative approach makes the bridge the first of its kind in the U.S.

Construction began on March 28, 2023, with completion initially expected by summer 2024. [2][4] The primary steel structure was fabricated and prefabricated at Cimolai’s workshop in northern Italy before being shipped to Indianapolis. [3] It opened to traffic on April 30, 2025. 6

The project is supported by funding from the City of Indianapolis and a $38 million grant from Lilly Endowment Inc., announced in March 2018, which helped launch the 16 Tech Innovation District. [1][4][5] Indiana University also donated land essential to the bridge’s development. [1]

Dimensions & Classification

Structural FormSuspension — Wire cable
Primary MaterialSteel
Total Length342'
Number of Spans3
Engineer / Designerschlaich bergermann partner
Practice for Architecture and Urbanism
BuildersCimolai

Leave a Reply

Spotted an error — a date, name, or fact? Send a correction and I'll review it.

References for this location, in MLA format.

Show all 6 sources
  1. Eckhardt, Jacqueline Cromlech. “A New Signature Bridge for Indianapolis.” 16 Tech Innovation District, 15 Dec. 2021. ↗
  2. “16 Tech Bridge Groundbreaking.” Techpoint, ↗
  3. “Construction Progress at Indianapolis' 16 Tech Bridge.” sbp, 6 May 2024. ↗
  4. “16 Tech Celebrates Bridge Groundbreaking.” 16 Tech Innovation District, 28 Mar. 2023. ↗
  5. Dwyer, Kayla. “Bridge in 16 Tech District to be 1st in Indy with more room for people than cars.” IndyStar, 15 Dec. 2021.
  6. “Celebrating Connection: 16 Tech Bridge Opens to the Public.” 16 Tech Innovation District, 30 Apr. 2025. ↗