About Falknor Road Bridge
The two-span, pin-connected Pratt through truss, along with an adjoining stone arch bridge, was constructed in 1899. Relocation work for a new Falknor Bridge began in June 1970 when sealed bids were being accepted by contractors for a replacement Falknor Bridge and alignment. 2 Approach roadway construction costs in 1971 were estimated at $39,225. 1
Structure
Dimensions & Classification
| Structural Form | Through Truss — Pratt |
|---|---|
| Total Length | 225 feet |
| Main Span | 112 feet |
| Connections | Pin-connected |
Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Sources & Citations
References for this location, in MLA format.
- “Road Program Includes New Lucas Bridge.” Piqua Daily Call, 3 May 1971.
- “Notice to Contractors.” Piqua Daily Call, 17 June 1970.
Comments