About Longley Covered Bridge
Sheldon and Savannah Jewett built the Longley Covered Bridge over the Trout River at Montgomery, Vermont, in 1863, cutting its timber at their own sawmill in the West Hill section of the town and framing it as a Town lattice truss, a design patented by Ithiel Town in 1821. It is the oldest of seven covered bridges they raised in Montgomery, the largest group in the state attributed to a single builder, and it was listed on the National Register of Historic Places in 1974.
Jan Lewandoski restored it in 1992 for $70,000. Twenty years later an inspection found the bridge leaning with its trusses bowed at the middle, and it closed to traffic in 2012. The rebuilt span, finished in 2017, kept the original design and now carries twenty tons.
History
The Longley Covered Bridge, known also as the Harnois Covered Bridge, carries Longley Bridge Road over the Trout River at Montgomery, Vermont. Built in 1863, the Town lattice truss is the oldest of a group of bridges in the area raised by the brothers Sheldon and Savannah Jewett. It was listed on the National Register of Historic Places in 1974.
The deck is laid in wooden planking, with reinforcing stringers since added beneath it, and the roof is of standing seam metal. 1 The lattice truss itself follows the design patented by Ithiel Town in 1821. 4
The Jewett Brothers
The Jewetts are credited with building all of Montgomery’s surviving covered bridges, seven in number, the greatest concentration in Vermont attributed to a single builder. 1 They kept a sawmill in the West Hill section of the town and prepared the timber for their bridges there.
Restoration
Jan Lewandoski carried out a complete restoration of the bridge in 1992 at a cost of $70,000. 2 4
A routine inspection by the Vermont Agency of Transportation afterward found several serious structural deficiencies, and the bridge was closed to traffic in 2012. 3 It had begun to lean to one side, and its trusses were bowed at the middle. A temporary prefabricated steel truss bridge was set immediately downstream to carry the traffic.
The rehabilitation that followed in 2017 preserved the original Town lattice design and retained the roof framing and upper lateral bracing. 3 New trusses and floor framing were designed to carry a live load of twenty tons. The work also included a fire retardant coating, a timber curb to protect the trusses, new steel-backed timber guardrail, and improvements to the approaches.
The project drew in part on the National Historic Covered Bridge Preservation Program, and the state’s congressional delegation announced a competitive grant of $850,000 from the Federal Highway Administration toward repairs and preservation. 5
Structure
Dimensions & Classification
| Structural Form | Through Truss — Town lattice |
|---|---|
| Primary Material | Timber |
| Total Length | 84'7" |
| Deck Width | 19'5" |
| Roadway Width | 16' |
| NRHP Reference | 74000220 |
| Builders | Sheldon Jewett Savannah Jewett |
Photographs







Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Sources & Citations
References for this location, in MLA format.
Show all 6 sources
- Henry, Hugh. Longley Covered Bridge. National Register of Historic Places, National Park Service, 1974. ↗
- Evans, Benjamin and June. New England's Covered Bridges. University Press of New England, 2004.
- “Longley Covered Bridge Rehabilitation.” Hoyle Tanner, ↗
- Hedbor, Eloise. “Good as old.” The Burlington Free Press, 14 Dec. 1992, pp. 9-11.
- “Delegation Announces $3.1 Million for Vermont Covered Bridges and Other Transportation Projects.” Bernies Sanders, 2 Aug. 2012. ↗