About Stoffer Road Bridge
The Pratt through truss was constructed in 1913 and rehabilitated in 1975. It is scheduled to be replaced in 2017, dependent on funding. 1 2
Structure
Dimensions & Classification
| Structural Form | Through Truss — Pratt |
|---|---|
| Total Length | 125 feet |
| Deck Width | 14 feet |
| Vertical Clearance | 18 feet |
Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Sources & Citations
References for this location, in MLA format.
- “2015 ANNUAL REPORT OF THE CONDITION OF ROADS, BRIDGES & CULVERTS IN RICHLAND COUNTY, OHIO.” Richland County Engineers Office, Apr. 2016. ↗
- Martz, Linda. “Malabar bridge gets attention.” News-Journal, 10 Jan. 2016, pp. 1.
Comments