About 16th Street Bridge
Built between 1946 and 1948 to replace the Emrichsville Bridge, the 16th Street Bridge carries traffic over the White River in Indianapolis, Indiana, on five reinforced concrete arches filled with earth and founded on untreated timber piles. It is listed on the National Register of Historic Places as a contributing resource to the Indianapolis Park and Boulevard System.
An inspection in 2016 found the arches leaching and shedding concrete, with water penetrating the fill above them, and testing in 2025 revealed significant thinning of the concrete. The bridge closed on June 1, 2026, for a two-year rehabilitation that will replace the material inside the arches, a task requiring the full width of the structure and ruling out any phased reopening. Six utility lines run within the bridge, five of which must stay in service throughout. Walkers and cyclists retain access while vehicles detour to the 30th Street and 10th Street bridges.
History
The 16th Street Bridge carries traffic over the White River in Indianapolis, Indiana. Built between 1946 and 1948, 2 it replaced the Emrichsville Bridge that had stood at the crossing before it. 3
The structure consists of five reinforced concrete arches carrying earth fill, supported on concrete spread footings bearing upon untreated timber piles.
The bridge is listed on the National Register of Historic Places as a contributing resource to the Indianapolis Park and Boulevard System, and the Indiana Historic Bridge Inventory classifies it as a Select bridge. 2
Rehabilitation
The engineering firm of Butler, Fairman & Seufert conducted a field inspection on March 8, 2016, to assess the condition of the structure. 2 The bridge then carried a sufficiency rating of 49.9 and a load rating of 20 tons.
The deck had been overlaid with asphalt at some point after construction, concealing the original concrete pavement and leaving its condition unknown. 2 The overlay itself was in poor condition, cracked and spalled, particularly near the concrete curbs, and patched in several places. The railing was in fair condition, recently repaired in part, though its steel was heavily rusted along most of its length and had never been crash tested.
The arches were likewise rated fair. 2 Isolated areas of heavy deterioration, leaching, and exposed reinforcing steel appeared on the underside, concentrated near the bottom of the arch rings, which indicated that water had penetrated the fill above. The corbels beneath the sidewalks were badly deteriorated on both sides of the structure. The spandrel walls showed cracking and leaching but held up on the whole.
The substructure was found satisfactory. 2 An underwater inspection recorded spalls and exposed reinforcing steel at several points, with as much as 20% section loss on Pier No. 5 and a spall exposing steel on Pier No. 3. Heavy debris had collected on the upstream side of Piers No. 2 and 4. The bridge was judged stable against scour, with no footings exposed.
A further inspection in 2017 found the deterioration advanced. 3 Funding was awarded the following year, and a public meeting was held in 2023, though the project was deferred to allow the rehabilitation of the 30th Street Bridge to finish first. Structural testing in 2025 revealed significant thinning of the concrete.
The bridge closed on June 1, 2026, for a rehabilitation expected to take two years. 1 3 The work encompasses repairs to the arch rings, which are the structure’s only support, the reconstruction of portions of the bridge, replacement of the roadway surface, and the installation of new waterproofing. Lighting is to be added once construction is complete.
The Indianapolis Department of Public Works required a full closure rather than phased lane restrictions. 3 The rehabilitation involves removing and replacing the material inside the arches, work that demands access across the entire width of the bridge. Removing that fill eliminates the stable surface on which vehicles would travel, and shoring the structure beneath a live load would raise the likelihood of compromising it. Staging space proved too constrained to replace portions of the arch rings while distributing loads safely in an unbalanced fill condition. Phasing traffic through the site would have yielded lower quality work, shortened the life of the rehabilitation, and extended both the cost and the duration of the project.
Six major utility lines run within the structure, five of which must remain in service throughout. 3 Keeping water flowing to the west side requires a temporary sixteen-inch bypass anchored directly to the bridge deck. The utility work is planned in two coordinated phases and requires the cooperation of several providers, a dependency that introduces schedule risk beyond the department’s control.
Pedestrian and bicycle lanes remain open during the work. Vehicle traffic has been detoured to the 30th Street Bridge, which reopened in May 2026, and to the 10th Street Bridge. 1
Structure
Dimensions & Classification
| Structural Form | Arch — Concrete |
|---|---|
| Primary Material | Concrete |
| Total Length | 687' |
| Main Span | 120' |
| Number of Spans | 5 |
| Span Lengths | 105', 110', 120', 110', 105' |
| Deck Width | 71' |
| Roadway Width | 58' |
| Vertical Navigational Clearance | 38'6" |
Photographs



















Suggest a Correction
Spotted an error — a date, name, or fact? Send a correction and I'll review it.
Sources & Citations
References for this location, in MLA format.
- Guffey, Alysa. “Detours ahead as Indy moves forward with 16th Street Bridge closure.” Indianapolis Star, 9 Apr. 2026. ↗
- Shergalis, Katlyn M. PE. Engineering Scoping Report. Butler, Fairman & Seufert, Inc. 2016. ↗
- 16th Street Bridge over White River. Indianapolis Department of Public Works, 7 Apr. 2026. ↗
Comments